Conair 5000 Betriebsanweisung Seite 62

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 111
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 61
Checking the Dewpoint (continued)
5 Turn on the portable instrument, and ensure there is positive airflow through
the sensor.
6 Monitor the readout and allow ample time for it to stabilize before
disconnecting the portable instrument. Some dewpoint monitors require a
substantial amount of time for residual moisture to be purged from the sensor.
7 In the event the dewpoint is not satisfactory, refer to the Troubleshooting
section of the manual, under A28 and P9 alarms for DC1.
8 Stop the dryer, and allow it to cool down. Then disconnect your portable
instrument and replace any pipe plugs that may have been removed.
9 Close or replace the side panel.
5-4 l Maintenance
1/8 inch NPT Hole Plug
Seitenansicht 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 110 111

Kommentare zu diesen Handbüchern

Keine Kommentare