Conair CHS-810 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Nein Conair CHS-810 herunter. Conair CHS-810 User's Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 88
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
CHS Tangential Feed
Granulators
Models CHS-810, CHS-814, CHS-819, and CHS-824
Corporate Office: 412.312.6000 l Instant Access 24/7 (Parts and Service): 800.458.1960 l Parts and Service: 814.437.6861
USER GUIDE
UGG011/0504
www.conairnet.com
WARNING - Reliance on this Manual Could Result in Severe Bodily Injury or Death!
This manual is out-of-date and is provided only for its technical information, data and capacities. Portions of this manual
detailing procedures or precautions in the operation, inspection, maintenance and repair of the product forming the subject
matter of this manual may be inadequate, inaccurate, and/or incomplete and cannot be used, followed, or relied upon.
Contact Conair at info@conairgroup.com or 1-800-654-6661 for more current information, warnings, and materials about
more recent product manuals containing warnings, information, precautions, and procedures that may be more adequate
than those contained in this out-of-date manual.
Seitenansicht 0
1 2 3 4 5 6 ... 87 88

Inhaltsverzeichnis

Seite 1 - Granulators

CHS Tangential FeedGranulatorsModels CHS-810, CHS-814, CHS-819, and CHS-824Corporate Office: 412.312.6000 l Instant Access 24/7 (Parts and Service):

Seite 2

1-4 l IntroductionThis manual applies to the CHS series of Conair granulators. Model nos. CHS-810, CHS-814, CHS-819, and CHS-824 specify the size of

Seite 3 - Table of Contents

Technical Specifications l 2-1Technical SpecificationsSpecifications of a CHS Granulator . . . . . . . 2-2SECTION22Technical Specifications

Seite 4 - 9. Wiring Diagram

Batch Feed Granulators CHS-810, CHS-814, CHS-819 and CHS-824OPTIONAL OPEN ROTORwith scissor-cutting, slant knivesSTANDARD STAGGERED ROTORwith disposab

Seite 5 - A. Customer Service

Function Description l 3-1Function DescriptionGeneral . . . . . . . . . . . . . . . . . . . . . . . . . 3-2Safety System . . . . . . . . . . . . . .

Seite 6

3-2 l Function DescriptionFunction DescriptionGeneralThe granulator is designed for grinding plastic waste to for recycling.The plastic waste should

Seite 7 - Introduction

Function Description l 3-33Function Descriptionmodels with a conveyor, the hopper is equipped with a conveyor belt. The conveyor can be equipped with

Seite 8 - Your Responsibility as a User

3-4 l Function DescriptionSafety SystemThe granulator has a safety system to prevent access to dangerous components during operation.The granulator h

Seite 9 - Read This so no One Gets Hurt

Function Description l 3-53Function DescriptionStar KnobThe star knob for the hopper and screen box is a very important component in the safety syste

Seite 10 - 1-4 l Introduction

3-6 l Function Description

Seite 11 - Technical Specifications

Safety Instructions l 4-1Safety InstructionsSafety Instructions . . . . . . . . . . . . . . . . . . 4-2SECTION44Safety Instructions

Seite 12 - TPGS019/0603

Please record your equipment’smodel and serial number(s) andthe date you received it in thespaces provided.It’s a good idea to record the model and se

Seite 13 - Function Description

4-2 l Safety InstructionsSafety InstructionsConair granulators are designed for granulating injection moulded, blow mouldedand extruded plastic waste

Seite 14

4Safety InstructionsSafety Instructions l 4-3DANGER! High voltage!This sign is on the door to the distribution box and the con-nection boxes.DANGER

Seite 15 - Function Description l 3-3

4-4 l Safety Instructions

Seite 16 - Safety System

Installation l 5-1InstallationPre-start checks . . . . . . . . . . . . . . . . . . . . . 5-2Two hours after first start . . . . . . . . . . . . 5

Seite 17 - Function Description l 3-5

5-2 l InstallationInstallationRead through the whole of Section 5 before installing the machine! All instructionsmust be followed in the given order

Seite 18

Installation l 5-35InstallationElectrical ConnectionThe granulator should be connected by a competent electrician.• Connect the granulator to the ma

Seite 19 - Safety Instructions

Opening of Hopper, Screen Box and Granule BinBefore opening the hopper, granule bin and screen box, switch both the main switch and granulator switch

Seite 20

Installation l 5-55InstallationClosing the Screen Box, Granule Bin and HopperNOTE: Before closing, make sure that the mating surfaces are clean!Ther

Seite 22 - 4-4 l Safety Instructions

Operation and Daily MaintenanceStarting and Stoping. . . . . . . . . . . . . . . . . 6-2Inspection . . . . . . . . . . . . . . . . . . . . . . . 6-3Cl

Seite 23 - Installation

Table of Contents l iTable of Contents1. IntroductionPurpose of the User Guide ...1-2H

Seite 24

6-2 l Operation and Daily MaintenanceOperation and Daily MaintenanceStarting and StoppingThe main switch is located beneath the control panel on the

Seite 25 - Electrical Connection

Operation and Daily Maintenance l 6-36Operation and Daily MaintenanceInspectionThere must be no plastic material left in the granulator when inspecti

Seite 26 - Granule Bin

6-4 l Operation and Daily Maintenance✐✐✐CleaningClean at color change, monthly or at least once/300 hours.Be careful when the hopper have been opened

Seite 27 - Installation l 5-5

Operation and Daily Maintenance l 6-5Cleaning (continued)NOTE: Use protective goggles and make sure that no material blows into the safety switches!1

Seite 28 - 5-6 l Maintenance

Fault-FindingThe granulator does not start• Check that the emergency stop is not activated.Reset by turning the button(s) in the direction of the arro

Seite 29

• Granulator with conveyor belt, if the conveyor belt does not start – check the conveyor belt overload circuit breaker.The conveyor belt motor has an

Seite 30 - Starting and Stopping

6-8 l Operation and daily maintenance

Seite 31 - Inspection

ServiceChanging the Knives . . . . . . . . . . . . . . . . . 7-2Removing the knives. . . . . . . . . . . . . . . . . 7-2Installing the Knives. . . . .

Seite 32 - Cleaning

ServiceAll service must be carried out by trained personnel in order to avoid personalinjury or damage to the machine.Changing the knivesRemoving the

Seite 33 - Cleaning (continued)

8 Undo and remove the socket cap screws (E) on the rear knife support rule (F).NOTE: Hold the fixed knife and support rule before removing the last sc

Seite 34 - Fault-Finding

ii l Table of Contents7. ServiceChanging the knives ...7-2Removing the knives

Seite 35

5 Install one rotating knife at a time on the knife attachment on the rotor.6 Install screws (A) with washers (B),and tighten so that they hold the kn

Seite 36

Service l 7-5Then install the front, fixed knife16 Install the knife in the knife attachment.17 Screw in the socket cap screws (C) and tighten so th

Seite 37 - Service l 7-1

Sharpening KnivesNOTE: Only rotating knives for granulators with an open rotor can be sharpened. Other knivesare disposable and are replaced when nece

Seite 38 - Changing the knives

Min. 2.205 in. (56 mm)35o30o0.0118 in.(3 mm)• Grind the cutting angle of the knives to 30°• Remove spacer “A” beneath the knife.• Tighten the knife a

Seite 39 - Service l 7-3

TransmissionV-Belts, Inspection, and AdjustmentThe granulator is driven by 3 V-belts.Checking the V-beltsThe tension and condition of the V-belts must

Seite 40 - 7-4 l Service

ABV-belt Adjustment• Remove the upper panel on the right-hand side of the granulator.• CHS series-noise encapsulated machine, remove the rear guard pl

Seite 41 - Service l 7-5

LubricationCutter HousingThe bearings in the cutter housing are permanently greased, and do not need greas-ing in normal circumstances.7-10 l Service

Seite 42 - Sharpening Knives

Cutter Pulley/Motor PulleyThe upper panel on the right-hand side of the granulator must be removed toremove/install the cutter or motor pulleys.This m

Seite 44 - Transmission

Spare Parts ListCutting Chamber . . . . . . . . . . . . . . . . . . . . 8-3Staggered Rotor . . . . . . . . . . . . . . . . . . . . 8-4Open Rotor . . .

Seite 45

10. LayoutCHS Series, Allround Hopper Noise Encapsulated,Hopper Loader, Non Soundproof . . . . . . . . . . . . . . . . . . . . . . . . . 10-2CHS Serie

Seite 46 - Lubrication

Spare Parts ListOrdering Spare PartsOnly use spare parts from Conair when replacing machine parts. Orders should go to the representative in the count

Seite 47 - Cutter Pulley/Motor Pulley

Cutting ChamberPos Qty. Art. no. Description1 3-029705 Cutter housing CHS-8103-030254 – ” – CHS-810 hardened3-029706 Cutter housing CHS-8143-030255 –

Seite 48 - 7-12 l Service

Staggered RotorPos Qty. Art. no. Description3-29702 Cutter CHS-810 3-blade3-30260 Cutter CHS-810 3-blade hardened3-29703 Cutter CHS-814 3-blade3-30261

Seite 49 - Spare Parts List

Open RotorPos Qty. Art. no. Description3-30113 Cutter CHS-810 3-blade open3-30263 Cutter CHS-810 3-blade open hardened3-29753 Cutter CHS-814 3-blade o

Seite 50

KnivesPos Qty. Art. no. Description NoteGranulator CHS-810Granulator CHS-814Granulator CHS-819Granulator CHS-8241 6 9 12 15 3-029503 Knife, rotating2

Seite 51 - Cutting Chamber

Pos Qty. Art. no. DescriptionTransmission 4,0 kW 1000 rpm 400 VTransmission 5,5 kW 1000 rpm 400 VTransmission 5,5 kW 1500 rpm 400 VTransmission 7,5 kW

Seite 52 - Staggered Rotor

ScreenScreen Box1432515Pos Qty. Art. no. Description NoteGranulator CHS-810Granulator CHS-814Granulator CHS-819Granulator CHS-8241 1 3-29574 Screen1 3

Seite 53 - Open Rotor

Granule Bin Manual (Optional)Pos Qty. Art. no. Description Note.Granulator CHS-810Granulator CHS-814Granulator CHS-819Granulator CHS-8241 1 1-29577 Gr

Seite 54 - Knives, Open Cutter

Vaccum Suction /Blower F-7/F-15Pos Qty. Art. no. Description Note.Granulator CHS-810Granulator CHS-814Granulator CHS-819Granulator CHS-8241 1 1-30082

Seite 55

HopperPos Qty. Art. no. DescriptionGranulator CHS-810Granulator CHS-814Granulator CHS-819Granulator CHS-8241 1 2-44613 Hopper, front1 2-44695 Hopper,

Seite 56 - Screen Box

iv l Table of Contents

Seite 57 - Granule Bin Manual (Optional)

Pos Qty. Art. no. DescriptionGranulator CHS-810Granulator CHS-814Granulator CHS-819Granulator CHS-8241 1 2-30673 Sound trap1 2-30654 Sound trap1 2-306

Seite 58 - Optional

Spare Parts List l 8-138Spare Parts ListPos Qty. Art. no. Description Note.Hopper device, granulator CHS-810 for hopper 2-44613Noise encapsulated m

Seite 59

Sound CabinPos Qty. Art. no. DescriptionGranulator CHS-810-Noise Encapsulated MachineGranulator CHS-814-Noise Encapsulated MachineGranulator CHS-819-N

Seite 60 - (Optional)

Spare Parts List l 8-158Spare Parts List8.17 Enclosure/BodyPos Qty. Art. no. DescriptionGranulator CHS-810Granulator CHS-814Granulator CHS-819Granu

Seite 61 - Hopper Device

8-16 l Spare Parts ListSafetyPos Qty. Art. no. DescriptionGranulator CHS-810Granulator CHS-814Granulator CHS-819Granulator CHS-8241 2 2 2 2 911002 Sw

Seite 62 - Sound Cabin

Wiring Diagram l 9-1Wiring DiagramWiring Diagram . . . . . . . . . . . . . . . . . . . . 9-2Current sensing relay . . . . . . . . . . . . . . . . 9-

Seite 63 - 8.17 Enclosure/Body

Wiring diagramNever change or modify the basic electrical settings of the granulator,without first obtaining permission from Conair. If the granulator

Seite 64

Current Sensing RelayThe granulator can be equipped with an optional current sensing relay tocontrol the feed equipment.The current sensing relay dete

Seite 65 - Wiring Diagram

ConnectionThe current sensing relay is connected in series with the mill motor via a current transformer.The transformer is connected between M and E1

Seite 66 - Wiring diagram

ExampleThe granulator is equipped with a current sensing relay to control a conveyor.A motor of 7.5 kW has a rated current of about 15 A.When this sta

Seite 67 - Current Sensing Relay

IntroductionPurpose of the User Guide . . . . . . . . . . . . . 1-2How the Guide is Organized . . . . . . . . . . . . 1-2Your Responsibilities as a Us

Seite 68 - Connection

9-6 l Wiring Diagram

Seite 69 - Relay Setting:

LayoutCHS Series, Allround Hopper Noise Encapsulated,Hopper Loader, Non Soundproof . . . . . . . 10-2CHS Series, Allround Hopper Noise Encapsulated,Bl

Seite 70 - 9-6 l Wiring Diagram

LayoutABCHS-810 26.77in. (680mm) 9.45in. (240mm)CHS-814 31.50in. (800mm) 14.17in. (360mm)CHS-819 36.22in. (920mm) 18.90in. (480mm)CHS-824CHS Series, A

Seite 71 - Layout l 10-1

Layout l 10-310LayoutCHS Series, Allround Hopper Noise Encapsulated with Conveyor,Band Conveyor, Hopper Loader, Non SoundproofBAABCHS-810 26.77in. (

Seite 73 - Layout l 10-3

AccessoriesOrdering Spare Parts. . . . . . . . . . . . . . . . 11-2Pre-Setting of Rotating Knives, Granulatorwith Open Cutter . . . . . . . . . . . .

Seite 74 - 10-4 l Layout

AccessoriesOrdering Spare PartsOnly use original Conair spare parts when replacing machinery components.Orders should be sent to the representative in

Seite 75 - Accessories

Pre-Setting of Rotating Knives,Granulator with Open CutterKnives can only be pre-set on granulators with open cutter.The knives are pre-set on a jig.

Seite 76

NOTE: The knives must butt up against the rings on the outer edges of the cutter housing.• Make sure that the knives butt up against the rear of the k

Seite 77 - Granulator with Open Cutter

ABCThird Fixed KnifeAs an optional extra, the granulator can be equipped with a third fixed knife toincrease the efficiency of the granulator.Open the

Seite 78 - 11-4 l Accessories

✐Purpose of the User GuideThis User Guide describes the Conair CHS Tangential Feed Granulators.It explains step-by-step how to install, operate, maint

Seite 79 - Third Fixed Knife

Band ConveyorThe band conveyor is designed for transporting plastic waste. The conveyor isconstructed from steelbeam. The frame pieces are assembled w

Seite 80 - Band Conveyor

11AccessoriesStartingWhen the band conveyor is started for the first time, the belt’s position on therollers should be checked. The belt must not move

Seite 81 - Trouble-shooting

Pos Qty. Art. no. Description3-030648 Band conveyor B200 CC27003-030650 Band conveyor B350 CC27003-030652 Band conveyor B450 CC27001 1 2-030649 Band c

Seite 82

Transport and StorageGeneral . . . . . . . . . . . . . . . . . . . . . . . . 12-2Unpacking and Checking . . . . . . . . . . . . . 12-2Lifting and Tran

Seite 83 - Transport and Storage

Transport and storageGeneralThe machine should be transported by trained personnel.The machine is delivered packed in protective plastic foil, fixed t

Seite 84 - Transport and storage

StorageThe machine is packed for transport to the place where it is to be used. On delivery it is protected with Castrol DWX 22 anti-rust oil.Long-Ter

Seite 85

12-4 l Transport and Storage

Seite 86 - 12-4 l Transport and Storage

We’re Here to HelpConair has made the largest investment in customer support in the plastics indus-try. Our service experts are available to help with

Seite 87 - Before You Call

A-2 l AppendixEquipment GuaranteeConair guarantees the machinery and equipment on this order, for a period asdefined in the quotation from date of shi

Seite 88 - Warranty Limitations

ATTENTION:Read This so no One Gets HurtWe design equipment with the user’s safety in mind. You can avoid the potentialhazards identified on this machi

Kommentare zu diesen Handbüchern

Keine Kommentare